LIVERPOOL, NEW YORK
Central School District Bus Garage
The project calls for four Stertil-Koni Diamond lifts to be installed to replace the bus garage's four original piston-style lifts. The concrete floor was broken, a trench was dug and a footer poured. Two steel cassettes rest on each footer, and the trench is then back-filled. Before the new floor is poured, CL&L runs PVC pipe for conduit and hoses. The last step is installing all the components of the lift in the empty steel cassettes as well as hooking up the control console.
Stertil Koni heavy duty lift Liverpool
Stertil Koni heavy duty lift Liverpool
Stertil Koni heavy duty lift Liverpool
Stertil Koni Diamond Lift heavy duty Liverpool
Stertil Koni heavy duty lift Liverpool
Stertil Koni heavy duty lift Liverpool
Stertil-Koni Diamond Heavy duty lift